In this paper, research on the resource-constrained project scheduling problem is classified according to specified objectives and constraints. Each classified area is extensively surveyed, and special emphasis is given to trends in recent research. Specific papers involving nonrenewable resource constraints and time/…
-
OpenAlex üst %10
OpenAlex 98.6%
A genetic algorithm (GA) approach is proposed for the general resource-constrained project scheduling model, in which activities may be executed in more than one operating mode, and renewable as well as nonrenewable resource constraints exist. Each activity's operation mode has a different duration and requires differ…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex 88.4%
Abstract This paper presents a stochastic integer program developed to determine how to schedule inspection, damage assessment, and repair tasks so as to optimize the post‐earthquake restoration of the electric power system. The objective of the optimization is to minimize the average time each customer is without pow…
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex üst %1
OpenAlex 99.1%
Özet henüz yok.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex üst %10
OpenAlex 97.7%
Özet henüz yok.
-
YÖKSİS
SJR Q3
JCR Q4
OpenAlex üst %1
OpenAlex 99.3%
Sustainable development requires scheduling and implementation of projects by considering cost, environment, energy, and quality factors. Using a robust approach, this study investigates the time-cost-quality-energy-environment problem in executing projects and practically indicates its implementation capability in th…
-
Discrete particle swarm optimization method for the large scale discrete time cost trade off problem 2016YÖKSİS SJR Q1 JCR Q1 OpenAlex üst %10 OpenAlex 97.8%
Özet henüz yok.
-
Discrete particle swarm optimization method for the large-scale discrete time-cost trade-off problem 2016YÖKSİS SJR Q1 JCR Q1 OpenAlex üst %10 OpenAlex 97.8%
Özet henüz yok.
-
YÖKSİS
SJR Q1
JCR Q1
OpenAlex üst %10
OpenAlex 98.5%
Özet henüz yok.
-
Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization 2019YÖKSİS SJR Q2 JCR Q3 OpenAlex üst %10 OpenAlex 96.2%
Özet henüz yok.
-
YÖKSİS
SJR Q2
JCR Q2
OpenAlex üst %10
OpenAlex 98.9%
Özet henüz yok.
-
YÖKSİS
SJR Q1
JCR Q2
OpenAlex 84.4%
Özet henüz yok.
Akademisyenler
18 akademisyen
- RİFAT SÖNMEZ 17 yazar konusu
- TAYFUN DEDE 16 yazar konusu
- GÜL POLAT TATAR 15 yazar konusu
- LİNET ÖZDAMAR 15 yazar konusu
- SAMAN AMİNBAKHSH 9 yazar konusu
- FİKRET ÜMİT BİLGE 8 yazar konusu
- CAN AKKAN 7 yazar konusu
- MÜBERRA ALLAHVERDİ 7 yazar konusu
- MEHMET YILMAZ 4 yazar konusu
- ADALET ÖNER 3 yazar konusu
- FATİH KASIMOĞLU 2 yazar konusu
- MURAT KILIÇ 2 yazar konusu